Sachin T on 19 Aug 2018 18:00:01
Power BI desparately needs to support:
Synchronised Drill down across multiple charts with the same hierarchy on the same page (or across the report)
It is extremely annoying, if I have seveal graphs, to have to drill down or up on each of them individually. A feature that allows you to synchronise the drill down state selected charts would be make the user interface incredibly friendly!
- Comments (22)
RE: Synchronised Drill Down across multiple charts with same hierarchy!
It is a must add feature
RE: Synchronised Drill Down across multiple charts with same hierarchy!
Please include this feature. Will be super beneficial
RE: Synchronised Drill Down across multiple charts with same hierarchy!
Not being able to sync drill downs of the same hierarchy across multiple visuals severely limits the usefulness of the drill down feature. Please add a syncing feature to the drill down, as it is a very common use case.
RE: Synchronised Drill Down across multiple charts with same hierarchy!
This is so important for usability please do asap.
RE: Synchronised Drill Down across multiple charts with same hierarchy!
Agreed, I have two visuals (Current year / Prior Year) sharing a hierarchy of business unit - sub category - individual stock items
it would be great to be able to drill down on one visual and the other matches.
RE: Synchronised Drill Down across multiple charts with same hierarchy!
I was shocked to find drill downs were not linked between visuals. this would be a great addition
RE: Synchronised Drill Down across multiple charts with same hierarchy!
We would love to have this. As it is, I may end up working around this by adding tabs in the report that the report designer can "pre-drill" for the viewer.
RE: Synchronised Drill Down across multiple charts with same hierarchy!
Would be very convenient to show numbers over time (in a matrix visual) and visualize them (in a line or area chart) on the same report page. Without being synchronized when drilling in the time axis such pages get confusing as matrix and chart are not in sync re time drill level. Can think of as having one master visual controlling the drill in itself and all other linked visuals on same page.
RE: Synchronised Drill Down across multiple charts with same hierarchy!
If added, this will be an extremely useful feature as it is quite common to have multiple visuals using the same hierarchy on one page.
RE: Synchronised Drill Down across multiple charts with same hierarchy!
Please add this, it makes sense on so many levels!